7-66 Keysight N5247B Service Guide
Repair and Replacement Procedures
Removing and Replacing the A57 Port 2 Noise Bypass Switch (Option 029)
7-
Removing and Replacing the A57 Port 2 Noise Bypass Switch
(Option 029)
Tools Required
T-6 TORX driver (set to 4 in-lb)
— T-10 TORX driver (set to 9 in-lb)
— T-20 TORX driver (set to 21 in-lb)
— 5/16 inch open-end torque wrench (set to 10 in-lb)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer cover. Refer to
“Removing the Covers” on page 7-6
3.
Position the analyzer bottom side up.
4.
Disconnect four semirigid cables (item
) from the A57 port 2 bypass
switch.
It may be necessary to disconnect or remove other cables to gain access.
If you do, make note of these cable connections for reconnection later.
5.
Disconnect the A57 bypass switch wire harness cable (item
) from the
A59 noise receiver (downconverter). Make note of the routing of this wire
harness so that the wire harness for the new bypass switch can be routed
in the same manner.
6.
Remove two screws (item
) that secure the switch to the switch bracket.
7.
Move the disconnected semirigid cables out of the way and remove the
switch from the analyzer. It may be necessary to loosen the other end of
the cables to allow them to be moved. Do not overbend them.
Replacement Procedure
IMPORTANT!
When an attenuator or a bypass switch is replaced in a PNA, it is important
to reset the Mechanical Counter setting. Refer to
Mechanical Counter” on page 7-101
.
Be careful not to damage the center pins of the semirigid cables. Some
flexing of the cables is necessary to remove the assembly. However, do not
over-bend the semirigid cables.
Содержание N5247B
Страница 10: ...10 Keysight N5247B Service Guide Contents ...
Страница 96: ...3 66 Keysight N5247B Service Guide Tests and Adjustments Adjustments 3 ...
Страница 157: ...Keysight N5247B Service Guide 4 61 Troubleshooting This page left intentionally blank ...
Страница 227: ...Keysight N5247B Service Guide 5 57 Theory of Operation Receiver Group Operation Figure 5 18 4 Port Receiver Group ...
Страница 228: ...5 58 Keysight N5247B Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 19 2 Port Receiver Group ...
Страница 238: ...5 68 Keysight N5247B Service Guide Theory of Operation Noise Measurement Group Operation Option 029 5 ...
Страница 243: ...Keysight N5247B Service Guide 6 5 Replaceable Parts Rebuilt Exchange Assemblies Figure 6 1 Module Exchange Procedure ...
Страница 268: ...6 30 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 270: ...6 32 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 373: ...Keysight N5247B Service Guide 6 135 Replaceable Parts Replaceable Parts Listings ...
Страница 381: ...Keysight N5247B Service Guide 6 143 Replaceable Parts Replaceable Parts Listings This page intentionally left blank ...
Страница 426: ...6 188 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 548: ...7 104 Keysight N5247B Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 565: ...Installation Note Xxxxx xxxxx 3 ...