QFX10016 Site Preparation Checklist
summarizes the tasks you need to perform when preparing a site
for a QFX10016 chassis installation.
Table 59: Site Preparation Checklist
✓
Item or Task
For More Information
Environment
□
Verify that environmental factors such as temperature a
humidity do not exceed router tolerances.
QFX10000 Environmental Requirements and
Specifications
Power
□
Measure the distance between external power sources
and the router installation site.
□
Calculate the power consumption and requirements.
"QFX10016 Power Planning" on page 170
Rack
□
Verify that your rack meets the minimum requirements
for the installation of the router.
QFX10000 Rack Requirements
□
Plan rack location, including required space clearances.
"QFX10000 Clearance Requirements for
Airflow and Hardware Maintenance" on page
165
□
Secure the rack to the floor and building structure.
Cables
156
Содержание QFX10016
Страница 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Страница 10: ...Compliance Statements for Environmental Requirements 428 x...
Страница 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Страница 16: ...Figure 1 QFX10016 Front and Rear 5...
Страница 175: ...Installing the QFX10008 into a Rack Mounting a QFX10016 in a Four Post Rack Using a Mechanical Lift 207 164...
Страница 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Страница 266: ...CAUTION Do not bump the output connections If the connection hits a solid object it could damage the power supply 255...
Страница 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Страница 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Страница 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Страница 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...