4. Grasp the handles and slide the RCB about halfway out of the chassis (see
Figure 95: Removing an RCB
5. Grasp each side of the RCB and slide it completely out of the chassis.
6. Place the RCB on the antistatic mat.
7. If you are not replacing the RCB now, install a cover in the empty slot.
Installing a QFX10000 Routing and Control Board
The QFX10000 line of modular chassis can have one or two Routing and Control Boards (RCBs),
depending on the configuration. RCBs can be installed in either of the two top slots on the front of the
chassis.
In redundant configurations, a QFX10000 RCB is a hot-removable and hot-insertable field-replaceable
unit (FRU). In base configurations, you need to install a second RCB before removing a failing RCB in
order to prevent the switch from shutting down.
Before you install a RCB, ensure that you have an electrostatic discharge (ESD) grounding strap.
To install a RCB:
238
Содержание QFX10016
Страница 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Страница 10: ...Compliance Statements for Environmental Requirements 428 x...
Страница 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Страница 16: ...Figure 1 QFX10016 Front and Rear 5...
Страница 175: ...Installing the QFX10008 into a Rack Mounting a QFX10016 in a Four Post Rack Using a Mechanical Lift 207 164...
Страница 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Страница 266: ...CAUTION Do not bump the output connections If the connection hits a solid object it could damage the power supply 255...
Страница 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Страница 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Страница 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Страница 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...