Figure 214: Attaching the QFX10016 to the Pallet
17. Write the RMA number on the exterior of the box to ensure proper tracking.
Packing QFX10000 Switch Components for Shipping
Before you begin packing a switch component, ensure that you have the following parts and tools
available:
• Antistatic bag, one for each component
• Electrostatic discharge (ESD) grounding strap
CAUTION: Do not stack switch components. Return individual components in separate
boxes if they do not fit together on one level in the shipping box.
To pack and ship QFX10000 components:
1. Place individual FRUs in antistatic bags.
382
Содержание QFX10016
Страница 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Страница 10: ...Compliance Statements for Environmental Requirements 428 x...
Страница 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Страница 16: ...Figure 1 QFX10016 Front and Rear 5...
Страница 175: ...Installing the QFX10008 into a Rack Mounting a QFX10016 in a Four Post Rack Using a Mechanical Lift 207 164...
Страница 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Страница 266: ...CAUTION Do not bump the output connections If the connection hits a solid object it could damage the power supply 255...
Страница 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Страница 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Страница 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Страница 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...