Installation and operating instructions: JUDO UNIDOS digital dosing pump systems JUD-KH 6-50 and 6-100 (cold water) / JUD-HH 6-50 and 6-100 (hot water)
All rights reserved.
JUDO Wasseraufbereitung GmbH
© JUDO Wasseraufbereitung GmbH
Postfach 380
D-71351 Winnenden
Translation into foreign languages and reproduction, even in excerpt form, is only permitted with special
approval.
Tel. +49 (0)7195-692-0
Fax +49 (0)7195-692-188
Revision level: 20.04.2017
E-Mail: [email protected]
Internet: www.judo.eu
21
Fig. 4: Connection of the dosing pump Fig. 5: Suction and dosing pipe connection
Suction pipe:
Guide the suction pipe through the union nut of the suction kit and the appropriate clamping ring,
then plug correctly on to the appropriate connecting cone of the insert.
Correctly secure the union nut at the connection of the suction kit so that the connection is leak-
tight.
Cut the suction pipe to the necessary length.
Guide the suction pipe through the union nut of the suction valve and the appropriate clamping ring,
then plug correctly on to the appropriate connecting cone of the insert.
Correctly secure the union nut at the connection of the suction valve so that the connection is leak-
tight.
Bleed pipe:
Correctly plug the bleed pipe on to the connection of the dosing head, cut to the necessary length
and lead with a clear outlet into the dosing tank.
Dosing pipe:
Guide the dosing pipe through the union nut of the dosing valve and the appropriate clamping ring,
then plug correctly on to the appropriate connecting cone of the insert.
Correctly secure the union nut at the connection of the dosing valve so that the connection is leak-
tight.
Bleed valve
Dosing pipe
Suction pipe
Bleed pipe
Union nut
Clamping
ring
Insert
with connecting
cone
Discharge opening