Installation and operating instructions: JUDO UNIDOS digital dosing pump systems JUD-KH 6-50 and 6-100 (cold water) / JUD-HH 6-50 and 6-100 (hot water)
All rights reserved.
JUDO Wasseraufbereitung GmbH
© JUDO Wasseraufbereitung GmbH
Postfach 380
D-71351 Winnenden
Translation into foreign languages and reproduction, even in excerpt form, is only permitted with special
approval.
Tel. +49 (0)7195-692-0
Fax +49 (0)7195-692-188
Revision level: 20.04.2017
E-Mail: [email protected]
Internet: www.judo.eu
44
8.2.2
Suction kit
Fig. 12: Suction kit
8.3
Replacement of the dosing diaphragm and the suction and pressure valves
The dosing diaphragm, suction and pressure valves must be replaced as necessary but
in any event no later than every 2 years or after 8000 operating hours!
Fig. 13: Removing the dosing head Fig. 14: Removing the dosing diaphragm
Fig. 15: Fitting the flange and dosing diaphragm Fig. 16: Positioning the dosing diaphragm
Unscrew the foot valve, remove the sieve and sleeve.
Carefully remove the protective cap with a suitable screwdriver and remove the valve ball .
Clean all parts with clean water.
Correctly reassemble the parts and fit the foot valve to the suction kit.
Bleed dosing pump each time it is cleaned (see Chap. 8.1).
Foot valve