Section 15
Maintenance & Inspection
15-4
15.1.4 Confirming operating time
Confirm the operating time of this system.
[Operation procedure]
Open the equipment operating time confirmation screen by performing the following menu operations.
[Menu] button
→
Maintenance
→
Operating Time
The following table show the contents displayed.
Item
Displayed information
Operating Time of Display Unit
Total
Total operating time of this equipment
LCD FAN
Total LCD fan operating time. The estimated replacement time is indicated
in ( ).
RPU FAN
Total RPU fan operating time. The estimated replacement time is indicated
in ( ).
Operating Time of Scanner Unit
Total
Total operating time of the radar antenna
Transmit
Total operating time of the transmitter. The estimated replacement time is
indicated in ( ).
Motor
Total operating time of the motor. The estimated replacement time is
indicated in ( ).
FAN
Total operating time of the radar antenna fan. The estimated replacement
time is indicated in ( ).
This item is displayed only when the current radar antenna
(magnetron/small solid state) is connected.
PS FAN
Total operating time of the power supply unit fan. The estimated replacement
time is indicated in ( ).
This item is displayed only when a new type of radar antenna (NKE-2255-
7/9/6HS) is connected.
TX FAN
Total operating time of the fan of the transmission unit. The estimated
replacement time is indicated in ( ).
This item is displayed only when a new type of radar antenna (NKE-2255-
7/9/6HS) is connected.
Memo
[Operating Time of Scanner Unit] is displayed only when the radar antenna is connecetd in
RADAR mode.
Содержание JMR-5410-4X
Страница 2: ......
Страница 22: ...xx NQE 3167 Power Control Unit NCT 4106A NSK Unit NBA 5111 Rectifier Warning Label Warning Label Warning Label ...
Страница 25: ...xxiii NKE 2255 7 9 6HS Scanner Unit Warning Label ...
Страница 27: ...xxv NKE 2103 4 4HS Scanner Unit NKE 2103 6 6HS Scanner Unit NKE 2255 7 9 6HS Scanner Unit ...
Страница 54: ...Contents 20 ...
Страница 68: ...Section 1 Overview 1 14 Outline Drawing of Radar Antenna NKE 2632 A ...
Страница 70: ...Section 1 Overview 1 16 Outline Drawing of Radar Antenna NKE 2043 NKE 2043 ...
Страница 72: ...Section 1 Overview 1 18 Outline Drawing of Radar Antenna NKE 2103 4 4HS ...
Страница 74: ...Section 1 Overview 1 20 Outline Drawing of Radar Antenna NKE 2255 7 ...
Страница 76: ...Section 1 Overview 1 22 Outline Drawing of Radar Antenna NKE 2255 6HS ...
Страница 78: ...Section 1 Overview 1 24 Outline drawing of 19inch Display NWZ 214 NWZ 214 ...
Страница 80: ...Section 1 Overview 1 26 Outline Drawing of Process Unit NDC 1678 NDC 1678 ...
Страница 82: ...Section 1 Overview 1 28 Outline Drawing of Trackball Operation Unit NCE 5605 Option ...
Страница 84: ...Section 1 Overview 1 30 Outline Drawing of Junction Box NQE 1143 ...
Страница 86: ...Section 1 Overview 1 32 Outline Drawing of 19inch Desktop Frame CWB 1659 ...
Страница 88: ...Section 1 Overview 1 34 Outline Drawing of Interswitch Unit NQE 3141 8A Option ...
Страница 126: ......
Страница 214: ...Section 4 Range and Bearing Measurement Methods 4 32 ...
Страница 244: ...Section 5 Basic Operation of the Radar 5 30 ...
Страница 324: ...Section 8 Monitoring a Dragging Anchor 8 8 ...
Страница 374: ...Section 11 Setting up Screen View 11 20 ...
Страница 380: ...Section 12 Setting up Alerts 12 6 Polygon tab Set a polygon alarm issuing range This function cannot be used now ...
Страница 520: ...Section 15 Maintenance Inspection 15 70 ...
Страница 546: ...Section 16 Failures and After Sale Services 16 26 ...
Страница 590: ...Appendix A Radar Antenna Display Unit Block Diagrams A 8 A 1 8 NKE 2255 7 9 6HS ...
Страница 592: ...Appendix A Radar Antenna Display Unit Block Diagrams A 10 A 1 10 NKE 2063A ...
Страница 596: ...Appendix A Radar Antenna Display Unit Block Diagrams A 14 A 2 3 NCE 5794 operation unit ...
Страница 622: ...Appendix D Menu List and Materials D 8 Tools VHF Call VHF1 Call VHF2 Call VHF3 Call ...
Страница 687: ......