15-37
Section 15
Maintenance & Inspection
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
23
24
24
26
27
Install the transceiver unit.
Install the transceiver unit into the scanner unit.
When installing the transceiver unit, put the unit inside, then slide it into the joint of the wave
guide tube.
Push the transceiver unit wholly so that the unit and the joint of the wave guide tube stick
together.
Fix the unit with bolts with washer.
Close the upper housing.
Before closing the upper housing, check that the packing has no abnormality, such as
deformation or cracks.
Also, remove foreign material and dust if attached.
Close the upper housing while pulling the center of the stay
If any hexagonal bolt is not tightened enough or is loosened, the waterproof performance may be
deteriorated. Be sure to tighten all bolts with specified torque (120 to 150kgf·cm).
Stay
Содержание JMR-5410-4X
Страница 2: ......
Страница 22: ...xx NQE 3167 Power Control Unit NCT 4106A NSK Unit NBA 5111 Rectifier Warning Label Warning Label Warning Label ...
Страница 25: ...xxiii NKE 2255 7 9 6HS Scanner Unit Warning Label ...
Страница 27: ...xxv NKE 2103 4 4HS Scanner Unit NKE 2103 6 6HS Scanner Unit NKE 2255 7 9 6HS Scanner Unit ...
Страница 54: ...Contents 20 ...
Страница 68: ...Section 1 Overview 1 14 Outline Drawing of Radar Antenna NKE 2632 A ...
Страница 70: ...Section 1 Overview 1 16 Outline Drawing of Radar Antenna NKE 2043 NKE 2043 ...
Страница 72: ...Section 1 Overview 1 18 Outline Drawing of Radar Antenna NKE 2103 4 4HS ...
Страница 74: ...Section 1 Overview 1 20 Outline Drawing of Radar Antenna NKE 2255 7 ...
Страница 76: ...Section 1 Overview 1 22 Outline Drawing of Radar Antenna NKE 2255 6HS ...
Страница 78: ...Section 1 Overview 1 24 Outline drawing of 19inch Display NWZ 214 NWZ 214 ...
Страница 80: ...Section 1 Overview 1 26 Outline Drawing of Process Unit NDC 1678 NDC 1678 ...
Страница 82: ...Section 1 Overview 1 28 Outline Drawing of Trackball Operation Unit NCE 5605 Option ...
Страница 84: ...Section 1 Overview 1 30 Outline Drawing of Junction Box NQE 1143 ...
Страница 86: ...Section 1 Overview 1 32 Outline Drawing of 19inch Desktop Frame CWB 1659 ...
Страница 88: ...Section 1 Overview 1 34 Outline Drawing of Interswitch Unit NQE 3141 8A Option ...
Страница 126: ......
Страница 214: ...Section 4 Range and Bearing Measurement Methods 4 32 ...
Страница 244: ...Section 5 Basic Operation of the Radar 5 30 ...
Страница 324: ...Section 8 Monitoring a Dragging Anchor 8 8 ...
Страница 374: ...Section 11 Setting up Screen View 11 20 ...
Страница 380: ...Section 12 Setting up Alerts 12 6 Polygon tab Set a polygon alarm issuing range This function cannot be used now ...
Страница 520: ...Section 15 Maintenance Inspection 15 70 ...
Страница 546: ...Section 16 Failures and After Sale Services 16 26 ...
Страница 590: ...Appendix A Radar Antenna Display Unit Block Diagrams A 8 A 1 8 NKE 2255 7 9 6HS ...
Страница 592: ...Appendix A Radar Antenna Display Unit Block Diagrams A 10 A 1 10 NKE 2063A ...
Страница 596: ...Appendix A Radar Antenna Display Unit Block Diagrams A 14 A 2 3 NCE 5794 operation unit ...
Страница 622: ...Appendix D Menu List and Materials D 8 Tools VHF Call VHF1 Call VHF2 Call VHF3 Call ...
Страница 687: ......