8-3
Section 8 Monitoring a Dragging Anchor
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
付録
8.2 Starting and Ending Dragging
Anchor Monitoring
8.2.1 Starting dragging anchor monitoring
[Operation procedure]
Open the dragging anchor monitoring screen by performing the following menu operations.
[Menu] button
→
Anchor Watch
1
When the dragging anchor monitoring screen is opened, the preview of the dragging
anchor monitoring area that was set on the chart is displayed (broken line).
When the dialogue is displayed, the own ship’s position is placed at the centre of the circle.
2
Set the dragging anchor monitoring to [On] by clicking on the [Monitoring Anchor]
button.
Dragging anchor monitoring starts based on the setting.
The dragging anchor monitoring area on the chart is changed to a solid line.
When own ship exits from the dragging anchor monitoring area, the "Dragging anchor" warning
is displayed.
8.2.2 Ending dragging anchor monitoring
Set the button display to [Off] by clicking on the [Monitoring Anchor] button.
Alternatively, use the following procedure.
1
Click the right mouse button on the dragging anchor monitoring circle.
A context menu is displayed.
2
Click on [Finish Anchor Watch] on the context menu.
The [Monitoring Anchor] button display is set to [Off] and the dragging anchor monitoring area
on the chart changes to broken line display.
Содержание JMR-5410-4X
Страница 2: ......
Страница 22: ...xx NQE 3167 Power Control Unit NCT 4106A NSK Unit NBA 5111 Rectifier Warning Label Warning Label Warning Label ...
Страница 25: ...xxiii NKE 2255 7 9 6HS Scanner Unit Warning Label ...
Страница 27: ...xxv NKE 2103 4 4HS Scanner Unit NKE 2103 6 6HS Scanner Unit NKE 2255 7 9 6HS Scanner Unit ...
Страница 54: ...Contents 20 ...
Страница 68: ...Section 1 Overview 1 14 Outline Drawing of Radar Antenna NKE 2632 A ...
Страница 70: ...Section 1 Overview 1 16 Outline Drawing of Radar Antenna NKE 2043 NKE 2043 ...
Страница 72: ...Section 1 Overview 1 18 Outline Drawing of Radar Antenna NKE 2103 4 4HS ...
Страница 74: ...Section 1 Overview 1 20 Outline Drawing of Radar Antenna NKE 2255 7 ...
Страница 76: ...Section 1 Overview 1 22 Outline Drawing of Radar Antenna NKE 2255 6HS ...
Страница 78: ...Section 1 Overview 1 24 Outline drawing of 19inch Display NWZ 214 NWZ 214 ...
Страница 80: ...Section 1 Overview 1 26 Outline Drawing of Process Unit NDC 1678 NDC 1678 ...
Страница 82: ...Section 1 Overview 1 28 Outline Drawing of Trackball Operation Unit NCE 5605 Option ...
Страница 84: ...Section 1 Overview 1 30 Outline Drawing of Junction Box NQE 1143 ...
Страница 86: ...Section 1 Overview 1 32 Outline Drawing of 19inch Desktop Frame CWB 1659 ...
Страница 88: ...Section 1 Overview 1 34 Outline Drawing of Interswitch Unit NQE 3141 8A Option ...
Страница 126: ......
Страница 214: ...Section 4 Range and Bearing Measurement Methods 4 32 ...
Страница 244: ...Section 5 Basic Operation of the Radar 5 30 ...
Страница 324: ...Section 8 Monitoring a Dragging Anchor 8 8 ...
Страница 374: ...Section 11 Setting up Screen View 11 20 ...
Страница 380: ...Section 12 Setting up Alerts 12 6 Polygon tab Set a polygon alarm issuing range This function cannot be used now ...
Страница 520: ...Section 15 Maintenance Inspection 15 70 ...
Страница 546: ...Section 16 Failures and After Sale Services 16 26 ...
Страница 590: ...Appendix A Radar Antenna Display Unit Block Diagrams A 8 A 1 8 NKE 2255 7 9 6HS ...
Страница 592: ...Appendix A Radar Antenna Display Unit Block Diagrams A 10 A 1 10 NKE 2063A ...
Страница 596: ...Appendix A Radar Antenna Display Unit Block Diagrams A 14 A 2 3 NCE 5794 operation unit ...
Страница 622: ...Appendix D Menu List and Materials D 8 Tools VHF Call VHF1 Call VHF2 Call VHF3 Call ...
Страница 687: ......