REV 02 OCT 2020 JLT4500-IOM-F
28
Note:
W2
or
W12
,
W3
,
W4
,
W5
,
W6
,
W8
have been installed in factory at
C3-C6
;
H1
has been installed in factory at
C1
-
C7
;
H2
has
been installed in factory at
C8
-
C14
. H1 and H2 need to be pulled straightly when assembling the carriage in column, and should be
fasten to the cable carrier at C1, C2, C13, C14 by wire ties at column bottom at both power side and idler side, see Fig.23. There will
be C8’ between C8 and GR4 for tall version extension column.
Fig. 23, Fasten hose to cable carrier
44) Mount the Main Control Box (
MCB
) to Power Side Column. Be sure to use correct mounting hardware to avoid interference with the
internal moving parts of the lift, refer to
§9.3. Skip this step if MCB has been installed in factory.
45) Route electrical wiring harness for power unit through power column.
W2 or W12: From C6
→
C7
→
Hole 2
→
CG3
→
the terminals of power unit
W3: From C6
→
C7
→
Hole 2
→
SOLENOID CONNECTOR of power unit
46) Route electrical wiring harness for Overhead limit switch through Power Side Column
W6: From C6
→
C7
→
GR1
→
CG4
→
the terminals of limit switch, see below Fig.24
Fig.24 Route the wiring for limit switch
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...