REV 02 OCT 2020 JLT4500-IOM-F
18
l)
Torque wrench:
If M16 (HILTI) mechanical anchors are used: 80 N·m minimum with 24 mm Hex socket;
If M16 (FISCHER) mechanical anchors are used: 100 N·m minimum with 24 mm Hex socket;
If M16 (HILTI) chemical anchors are used: 80 N·m minimum with 24 mm Hex socket;
m)
3.6 m Step ladder
n)
Anti-Seize lubricant (for arm pins and foot pad screw threads and stop rings)
o)
A lifting device, such as a Crane or Fork lift, with a minimum admissible load of 1500 kg
p)
Hydraulic Oil with a viscosity of 46 Cst. at 40°C according to ISO 6743-4-ISO VG46 norms (alternate Hydraulic Oil according to
ISO32 can be substituted).
5.3.3 INSTALLATION
5.3.3.1 CHECKING BEFORE INSTALLATION
1)
Review Shipment for damage and report, see
§5.2.1
2)
Inspect Install sight for proper floor requirements, ceiling height requirement, etc. see
§ 5 . 1 . 1 / F i g . 3 / T a b l e 1
. Be certain that the
proper conditions exist.
5.3.3.2 LAYOUT AND INSTALLATION
3 )
Layout the service bay using chalk lines according to the architect’s plans or owner’s instructions ( S e e
§ 5 . 1 / Fig. 3
/
Table 1
) .
DANGER
Failure to install the lift as per the orientation given in §5.1 can result in personal and property damage.
4)
Break down crate carefully.
5)
Remove components (Arms, Overhead assembly, etc).
6)
Separate Column and position with base hanging over pallet.
7)
Assemble Idler Column Extension (EAS2185V24A) to Idler Column Assembly (EAA0459T02A) using M10 x 20 Hex flange bolts, hand
tighten hardware only at this time, see
Fig. 4
.
Fig. 4, Idler side Column assembling
8)
Assemble Idler Lock Cover Assembly (EAM0128V03A) to Idler column, see
Fig. 5
. Don’t need to install the screw tightly.
Fig. 5, Install the Idler Lock Cover
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...