REV 02 OCT 2020 JLT4500-IOM-F
20
Fig. 8, Install Overhead sub-assembly
12) Assemble Power Column Extension (EAS2185T23A) to Power Column Assembly (EAA0459T01A), hand tighten hardware only at this
time, see
Fig.9
.
Fig. 9, Power side Column assembling
13) Assemble Mounting Bracket (EAM0128V05A) to Power Unit, and assemble four sets of Bolts (1-17188A) and Nuts (1-15788A) into the
holes on the Mounting Bracket, leave 5-7mm free distance from the flange face to the Bracket, see
Fig.10
WOODEN
BLOCK
ONE BOLT ON THE SAME
LOCATION OF EACH SIDE,
HAND TIGHT ONLY.
BOLT:M10x20,1-25788A;
NUT M10,1-14788A
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...