REV 02 OCT 2020 JLT4500-IOM-F
22
17) Connect one end of the Power Unit Hose (EAH0065V28A, L=490) to the installed Bulkhead fitting(EAH0072T09A), another end to the
fitting (EAH0065V20A) on Power unit, see
Fig. 13
.
Fig. 13, Assemble Hose
18) Assemble Power Side Lock Cover Assembly (EAM0128V03A, SCREW 1-02088A) to power column, see
Fig. 13
Don’t need to install
the screw tightly.
19) Using the Overall Width (C) Dimension from
Table1
/
Fig. 3
, chalk two parallel lines (within 2mm tolerance) and one CENTER LINE on
the floor. See below
Fig. 14
.
NOTE: The anchor bolts must be installed at least 200 mm from any crack, edge, or expansion joint.
Fig. 14, Layout the columns
20) Erect or lift Power Column assembly using a mechanical assist such as lift truck or Jeanie Lift.
DANGER
Make sure that while raising the column, the load is always properly held. To install the lift is preferable to use a crane; using a fork
lift is acceptable, but in this case oversized forks shall be installed, positioning them as close as possible to the load
21) Position Power Column on chalk lines from bay layout and confirm rectangle notches are aligning with the CENTER LINE, see
Fig.
14.
22) Drill one anchor hole using the base plate as a template at
HA
(see
Fig. 14
) to a depth of 150mm minimum, but DO NOT drill through
the concrete, see step 1 of
Fig. 15
.
NOTE: Use a concrete hammer drill with a carbide bit. Tip diameter should conform to
§
5.3.2. Do not use excessively worn
bits or bits which have been incorrectly sharpened. A core bit may be necessary if an obstruction is encountered. NEVER
substitute with shorter anchor.
EAH0072T09A
EAM0128V03A,
Lock Cover
1-02088A,
M5X8, 4Pcs
EAH0065V28A
Power Side Column Extension
Power Side Column Assembly
Power Unit
EAH0065V20A
Rectangle Notch
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...