REV 02 OCT 2020 JLT4500-IOM-F
10
4.4 ELECTRIC HAZARD
This hazard is present if the electric connections are not compliant to the applicable safety local norms.
ATTENTION
Before connecting the lift to the electric line, verify that the line itself is completely compliant to the enforced norm.
Also make sure that the electric line can supply the needed power and that:
•
there is a properly working grounding circuit
•
there is a properly working protection circuit
ATTENTION
Before plugging the lift to the main power supply or before any maintenance work, make sure that the main switch of the power
supply is set to the OFF (0) position.
4.5 GENERIC HAZARDS
Any other use or operation not in compliance with this manual could cause damages to the user and or to the lift.
An un-forecasted and unexpected use alters the technical characteristics for which the lift has been designed and manufactured and could
then compromise its correct and safe use.
DANGER
The lift was designed for indoor operation only. Do not install and/or use this lift outdoor.
DANGER
It is absolutely forbidden to raise persons with this lift.
It is forbidden for people to stand on the load or load carrying devices when they are raised.
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...