REV 02 OCT 2020 JLT4500-IOM-F
55
Fig. 43, CARRIAGES AND ARMS
ITEM #
PART #
QTY/LIFT
DESCRIPTION
1
EAA0459V20A
24
SLIDE BLOCK ASSEMBBLY
2
EAS2185T01A
1
CARRIAGE WELDMENT LS
3
EAS2185V26A
1
CARRIAGE WELDMENT RS
4
EAM0119V71A
4
TENSION SPRING
5
EAM0138T31A
4
INNER GEAR PIN
6
1-08389A
4
GEAR LOCK SPRING GB/T2089-2009 YA 3×28×41
7
EAM0138V79A
4
SMALL LOCK GEAR
8
1-00187A
4
GB/T 894.1 25 RESTRAINING RING
9
1-24788A
4
M10 THIN HEX NUT
10
1-14888A
4
HEX BOLT GB/T 5781-2000 M10
×
25
11
EAM0119V79A
2
DOOR PROTTECTION RUBBER
12
1-00688A
4
FLAT WASHER
Ф
8 GB/T95-2002
13
1-05988A
4
HEXAGON SOCKET HEAD CAP SCREW DIN 912 M8×30 CLASS 8.8
14
EAM0138T17A
4
ARM PIN
15
EAM0150V03A
8
PRESS BLCOK
16
EAM0138V83A
4
HALF ROUND LOCK GEAR
17
1-01688A
20
SPRING WASHER D12 GB/T93-1987
18
1-25588A
20
HEX BOLT M12x30 GR.12.9,GB/T70.1-2000
19
1-00587A
4
SNAP RING 38 DIN 471
20
1-15288A
4
PHILIPS HEAD SCREW DIN 965 M6×16 CLASS 4.8
21
EAM0119V61A
4
LOAD RUBBER PAD
22
EAS2172V19A
4
LOAD PAD WELDMENT
23
EAM0119V65A
4
LOAD PAD SCREW
24
EAM0138T42A
1
CARRIAGE BAR, HEIGHT SENSOR
25
1-17788A
2
SCREW M6x20 GB/T70.1-2008
26
1-04588A
2
D6 SPRING WASHER GBT93-1987
27
EAA0459T04A
2
REAR ARM ASSEMBLY
28
EAA0459T05A
1
FRONT LEFT ARM ASSY
29
EAA0459T06A
1
FRONT RIGHT ARM ASSY
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...