REV 02 OCT 2020 JLT4500-IOM-F
27
Fig. 22, Lubricate the footpad assembly
5.3.3.4 CONNECTION OF THE ELECTRIC BOX
DANGER
Do not connect the lift to the electric line before having verified that the line itself is completely compliant to the enforced norm.
DANGER
Do not connect the lift to the electric line before having verified that there is a properly working grounding circuit and there is a
properly working protection circuit.
The electric motor powering the hydraulic pump is available in the following voltages:
Voltage
Frequency
Phases
Power
400 V
50 Hz
3 PH
4.0 KW
230 V
50 Hz
1 PH
4.0 KW
The Owner/Employer will have to supply the connection to the electric line. Use a cable with wires having a minimal section of 1.5 mm² (
Three
phase, W1
) or 4.0 mm² (
Single phase, W11
) for each of the phases and the ground. The cable shall also have a plug compliant to the locally
enforced safety laws. See the wiring diagram of the lift at
§12.4
:
Each lift should have a dedicated circuit with a breaker or time delay fuse sized according to the chart.
43) Refer to the Wiring Diagram for all steps under this heading; see below Table 5 and Fig.29.
Table 5
CODE
DESCRIPTION
MCB
Main Control Box
RCB
Remote Control Box
LC1
Safety Lock Cover on Power Side Column
LC2
Safety Lock Cover on Idler Side Column
C1~C10
Clamps for Hydraulic hoses and Electrical wiring harness
CG1~CG8
Cable glands for Electrical wiring harnesses
GR1~GR5
Guide rings on Overhead for guiding hoses and wiring harnesses
W (W1 or W11)
Power supply cables prepared by Owner/Employer
W2~W8 and W12
Electrical wiring harnesses
H1
Hydraulic hose on power side column
H2
Hydraulic hose on idler side column
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...