REV 02 OCT 2020 JLT4500-IOM-F
11
DANGER
It is not allowed to perform any type of aid and/or maintenance operation to the lift while being operated
.
DANGER
Before operating the lift, make sure that the vehicle to be lifted does not have any fluid leakages.
If fluids are spilled on the floor immediately remove them.
DANGER
Do not wash the vehicle on the lift.
DANGER
Before operating the lift, visually check all the components of the lift and in particular the safety
devices for possible defects. Do not operate the lift even if any defect is detected.
DANGER
The sound level of the noise generated by the lift is Laeq≤84 dB (A).
4.6 EMERGENCY STOP
In the case an emergency stop is needed, to interrupt the operation of the lift, just release the main switch and it will automatically rotate back
in the “OFF” position, see
Fig. 1
; or press the E-Stop button, see
Fig. 2
. In order to resume the working cycle previously
interrupted, the user shall turn the main switch clockwise into the “ON” position or turn the mushroom head of the E-Stop button clockwise
until it rebound.
Fig. 1, Main switch on the main control
box of Power Side Column
Fig. 2, E-Stop on the remote control
box of Idler Side Column
Содержание JLT4500S
Страница 3: ...REV 02 OCT 2020 JLT4500 IOM F 3 ...
Страница 13: ...REV 02 OCT 2020 JLT4500 IOM F 13 Fig 3 General Specifications Service Bay Layout ...
Страница 46: ...REV 02 OCT 2020 JLT4500 IOM F 46 9 1 PARTS BREAKDOWN OF FINAL ASSEMBLY Fig 38 FINAL ASSEMBLY ...
Страница 49: ...REV 02 OCT 2020 JLT4500 IOM F 49 9 3 PARTS BREAKDOWN OF PARTS ON COLUMNS Fig 40 PARTS ON COLUMNS ...
Страница 52: ...REV 02 OCT 2020 JLT4500 IOM F 52 9 5 PARTS BREAKDOWN OF SYNCHRONIZING SYSTEM Fig 42 SYNCHRONIZING SYSTEM ...
Страница 54: ...REV 02 OCT 2020 JLT4500 IOM F 54 9 6 PARTS BREAKDOWN OF CARRIAGE AND ARMS ...
Страница 64: ...REV 02 OCT 2020 JLT4500 IOM F 64 Check Report Summary Description Date and Name ...
Страница 65: ...REV 02 OCT 2020 JLT4500 IOM F 65 12 ELECTRICAL DIAGRAM 12 1 WIRING DIAGRAM FOR THREE PHASES SHEET 1 3 ...
Страница 66: ...REV 02 OCT 2020 JLT4500 IOM F 66 12 2 WIRING DIAGRAM FOR SINGLE PHASE SHEET 2 3 ...
Страница 67: ...REV 02 OCT 2020 JLT4500 IOM F 67 12 3 WIRING DIAGRAM OF CONTROL BOXES SHEET 3 3 ...
Страница 68: ...REV 02 OCT 2020 JLT4500 IOM F 68 12 4 WIRING DIAGRAM OF THE ELECTRICAL SYSTEM ...
Страница 70: ...REV 02 OCT 2020 JLT4500 IOM F 70 13 FOUNDATION PLAN ...