
Engine Overhaul Manual
Jabiru Aircraft
Pty Ltd
Jabiru 2200 & 3300 Aircraft Engines
This document is controlled while it remains on the Jabiru server. Once this no longer applies the document becomes uncontrolled.
ISSUE
1
2
3
4
5
6 7
Dated : 28/10/2014
Issued By: AS
Page: 179 of 201
L:\files\Manuals_For_Products\Engine_Manuals\Overhaul_Manual\JEM0001-7_Overhaul_Manual_DRAFT_(29_10_14).docx
9.10 Top End Overhaul Booklet
9.10.1 Engine Details
Engine Serial #:
Date:
9.10.2 Top End Subassembly A Build Sheet
– Conrods
Table 27
– Top End Build Sheet A
No.
Details
Para
Initials
Checked By
Date
A1
Clean Conrods
A2
Inspect and measure Conrods (includes bearing
crush, bearing clearance)
A3
Fit the Conrods to the Crankshaft; Use Loctite
620 on the bolts and torque per Table 9
A4
Record measurements & clearances in build
record
sheet
-
Ensure
all
measurements and clearances are within the
appropriate limits given in Table 10 and Table 12
-
A5
Stage A - Stage Inspection of Assembly
I hereby certify that the above subassembly has been assembled in accordance with the applicable Jabiru
Pty Ltd Instructions and Maintenance procedures.
Signed:
Date:
for Jabiru Aircraft Pty Ltd
MPI Release Note No.