2.
First Half of Stuffing Box Gland Installed.
3.
Lay Gland Bolts on bottom half of Gland with bolt heads in bearing housing slots. Nuts and spe-
cial cup washers should be all the way back on the bolts, toward the bolt heads as shown.
4.
Install top half of stuffing box gland over gland bolts and bottom half of gland.
3.5 Connection of piping to quenching gland
24
3405-3406-3416 Installation, Operation and Maintenance Instructions
Содержание Goulds Pumps 3405
Страница 1: ...Installation Operation and Maintenance Instructions 3405 3406 3416 ...
Страница 2: ......
Страница 19: ...Figure 6 2 5 Install suction piping 3405 3406 3416 Installation Operation and Maintenance Instructions 17 ...
Страница 41: ...7 3 Sectional view 7 3 Sectional view 3405 3406 3416 Installation Operation and Maintenance Instructions 39 ...
Страница 42: ...7 3 Sectional view 40 3405 3406 3416 Installation Operation and Maintenance Instructions ...