63
■
Slowly pull directly upward.
Failure to follow this could
result in damage to parts.
Replacement of the transfer ball element set
Replacement procedures
Before replacement
10-4.
Replacement of the
transfer ball element set/
Grease filling procedure
Replacement of the transfer ball element set
Removing the top cover
Replacing the transfer ball element set
Remove all ultra-low head
bolts (M5), and remove the
top cover.
1
Remove the transfer ball
element set to be replaced
from the MABS main unit.
1
■
Shut down the power, leave for three minutes or more, and discharge electricity inside the
DC power supply equipment.
■
Wear protective equipment, such as gloves.
Tools to be used
3mm hex. wrench
Top cover
Bolt for mounting a top cover
Transfer ball element set
Transfer ball element set
10. Maintenance/Inspection
MABS technical document
Safety precautions
Advanced preparation
Product check
Structures
Installation/Wiring
Control/Operation
Maintenance/Inspection
Troubleshooting
Appendix
IB-E06F-M1 settings
Replace a ball element which has
the following symptoms.
・
The actual speed is slower
than the set speed.
・
Abrasion or excessive wear on
the ball (Groove depth is 1.5mm
or higher, as shown on the
drawing)
Transfer ball
Transfer ball
element set
1.5
mm
or over
Original notice - U1.1