54
※
For details on LED display on
controllers and error information,
refer to 10-1. Controller’s LED
display (P.57).
Items to check before turning on the power
Items to check after turning on the power
■
Turn off the power, wait a sufficient amount of time, and discharge electricity inside the DC
power supply equipment.
■
Post warning labels so as to prevent unauthorized persons from turning on the power.
■
After completing measures to prevent clothes from getting caught during transfer, perform
inspection.
■
Take safety measures, such as getting ready to shut off the power in the event that
something should happen.
Turn off the power of all connected devices, and perform the following inspection,
taking necessary measures.
Manually input the signal to controllers/control devices according to inspection
contents.
9-2.
What to do
before operation
Start-up inspection
Parts to be inspected
Items to be checked
Description of measures
Secured positions of the
MABS main unit
s
w
e
r
c
s
n
e
t
h
g
it
-
e
R
s
s
e
n
e
s
o
o
l
w
e
r
c
S
MABS main unit
External abnormalities, such as
scratches or breakage
Transfer ball
Cracks, wear, and/or damage on the
surface
Controller
Damage, deformation
Screw looseness on secured positions
Mounting failure for controller and connectors
Damage to cables/Wiring failure
Contact the supplier
Re-tighten screws
Correctly mount connectors
Perform wiring correctly
Refer to P.61
Others
Parts deformation, damage
Cable damage
Contact the supplier
Contact the supplier
Parts to be inspected
Items to be checked
Description of measures
MABS main unit
Abnormal sound
Abnormal temperature rise in the motor
(Check with the controller’s ERR LED)
Others
Leakage from equipment
Controller
Abnormal temperature rise
Error check with LED display
Contact the supplier
Check error contents, and
eliminate the causes.
Contact the supplier
Check grounding on
equipment, perform grounding
Transfer ball
The specified speed cannot be achieved
Check that there is no foreign
material stuck and/or no
interference with the top
cover in the transfer ball
section, and eliminate any
causes.
<
Normal LED display after the power is turned on
>
10-3. Before replacement work
Start-up inspection
STS
NS
MS
(
Green
) ON
(
Green
) Blinking
〔
1Hz
〕
(
Green
) ON
ERR A
ERR B
OFF
OFF
MABS technical document
Safety precautions
Advanced preparation
Product check
Structures
Installation/Wiring
Control/Operation
Maintenance/Inspection
Troubleshooting
Appendix
IB-E06F-M1 settings
9. Control/Operation
To prevent accidents and/or damage to devices during operation, refer in advance
and before operation to the following points, and check the safety.
Original notice - U1.1