![irinox ICY L Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/irinox/icy-l/icy-l_use-and-maintenance-instructions_2090427014.webp)
14
Preliminary Operations
Description
Phase
Front panel screen
FIRST TURN ON
CHAMBER PRE-COOLING
3.4. DESCRIPTION AND OPERATION
Before introducing the product in the chamber,
it is recommended to carry out pre-cooling.
1
Power the blast chiller and leave it at “Stand-by”
for about 60 minutes.
This way the sump resistance will have time
to heat the compressor.
This avoids breakdown at the first turn-on,
due to returning refrigerant liquid.
1
Start the chosen cycle for at least 5 minutes before
putting the hot food into the blast chiller
Blast chiller cycle selection and start-up
Description
Phase
1
Power the Blast chiller
and touch the display in stand-by
to view the initial grid
Front panel screen
Select the cycle pressing:
•
for the DE3°C cycle
•
for the 3°C cycle
•
for the DELICATE -18°C cycle
•
for the STRONG -18°C cycle
2
Содержание ICY L
Страница 35: ......