71
Chapter 6
GLZ Graphics
This chapter provides instructions for replacing graphics boards in the
deskside workstation, and installing dual-screen upgrades.
Open the base unit, take static precautions, and attach an antistatic wrist
strap as described in Chapter 3, “Opening and Closing the Base Unit,”
before replacing graphics boards or installing dual-screen upgrades.
Note:
Refer to GLZ6 Setup and Maintenance Guide for board replacement
and dual-screen upgrade instructions for GLZ6 graphics.
Replacing the Graphics Boards
The following table shows the graphics boards for each GLZ option installed
in the system’s PCI slots, including single screen (SS) and dual-screen (DS)
configurations, and the Geometry Accelerator board (GA).
Graphics
Slot 1
Slot 2
Slot 3
Slot 4
Slot 5
GLZ1 SS
GLZ1
GLZ1 DS
GLZ1
GLZ1
GLZ1T SS
GLZ1T
GLZ1T DS
GLZ1T
GLZ1T
GLZ2 SS
GLZ2
GLZ2 DS
GLZ2
GLZ2
GLZ3
GA
GLZ3
GLZ3 DS
GA
GLZ3
GLZ3
GLZ4
GA
GLZ4
GLZ4 DS
GLZ4
GLZ4
GA
GLZ5
GA
GLZ5
GLZ5 DS
GA
GLZ5
GLZ5
Содержание TDZ-400 Deskside
Страница 1: ...TDZ 400 Deskside Setup and Maintenance Guide March 1996...
Страница 28: ...14 Chapter 1 Getting Started...
Страница 38: ...24 Chapter 2 Configuring the System 11 Restart the system...
Страница 68: ...54 Chapter 4 Maintaining the System...
Страница 112: ...98 Chapter 8 Troubleshooting...
Страница 136: ......