Minifors 2 - Benchtop Bioreactor
Before Cultivation
07 February 2019
Page
103
of
214
2.
Insert the rapid coupling of the water
inlet
hose – note the
symbol on the basic unit - onto the
lower
connection nozzle
on the exit gas cooler.
3.
Insert the rapid coupling of the water
outlet
hose – note the
symbol on the basic unit - onto the
upper
connection nozzle
on the exit gas cooler.
INFORMATION
The exit gas cooler only works when the temperature control
system is switched on (
Temperature
ON parameter)
8.2.5 Coupling the Motor
For routine operation, it is not necessary to plug in and unplug the
motor cable. The motor connected during installation is only cou-
pled before cultivation. For details about connecting the motor ca-
ble, see the main chapter “Installation and Initial Operation” and
the chapter “Connecting the Motor Cable”.
Содержание Minifors 2
Страница 1: ...Operating Manual 2019 02 07 Minifors 2 Benchtop Bioreactor Dok ID 75623 V 03 00 Original...
Страница 217: ......