Confidential Information - Do Not Distribute
1.
install the Repeater frame with its pole on the selected installation
point of the Repeater and install the couple of Radios on it. The Radio
set as Access Point AP has to face the IBIS-ArcSAR, while the antenna
set as Station has to face the Control Room. Fasten radios with
provided ties;
2.
install the Repeater batteries, connecting them to the Repeater
Supply Panel (
) using the provided cable with specific pins; put
the blue covers on them;
Fig. 72 – Repeater battery with blue cover installed
3.
install the Repeater Solar Panels on their frame and then, plug their
cables to the Repeater Supply Panel;
4.
if the AC Mains is available at the Repeater site, supply the batteries
plugging the specific cable to the Repeater Supply Panel;
Fig. 73 – Schematic diagram of the Repeater Supply Panel
5.
connect the radios to the Repeater supply panel with the Ethernet
cables: in this way the radios will be supplied by the Repeater
batteries and they will be connected together with an internal
Ethernet cross cable;
6.
install the Repeater Supply Panel on the pole;
7.
fill up the stabilizing mass with water.