FIRST IBIS-ArcSAR START UP
IDS GeoRadar S.r.l.
Confidential Information - Do Not Distribute
MNG/2017/0016 Rev 1.0 63/ 78
Fig. 137 – Opening jack switches
6.3.4
Turning on the Genset Isolation point on the Supply Unit
open the Isolation Point panel on the front side of the ArcSAR (
Fig. 138 – Isolation Point panel on Supply Unit front side
open the Isolation Point switchboard, turning the GENSET Isolation
Point switch on (
Fig. 139 – GENSET Isolation Point switch turned on
6.3.5
Lower hydraulic legs
lower hydraulic legs (right side of the trailer) acting on the four black
pistons. Check the right drop of jacks over the plywood bases (