92 / 136
00RNO0333-B (U0625869)
EVO S -
Installation and Servicing
Diagram : VF10
page 5 / 7
On boiler No. 2 or the following boilers: slave
Line No. Value
• Configuration
menu
Boiler pump supplied by IDEAL
No adjustments necessary
Boiler pump supplied by the customer
(all-or-nothing control)
Relay output QX3
(5892) Boiler pump Q1
• LPB network
menu
Configure the boiler as a slave in the
cascade:
Device address
(6600)
2 (or following, for
the other slaves)
Segment address
(6601)
0
Bus power supply function
(6604)
Automatically
Clock mode
(6640)
Slave without
remote setting
• Connect the bus between the boilers (
pay attention to the polarity).
•
Switch off, then switch on the slave boiler(s). If the communication has been correctly established,
the clock is updated correctly.
E. ELECTRICAL AND HYDRAULIC VALIDATION
On boiler No. 1: master
•
Cascade diagnostic
menu
Check that all the boilers are in the cascade
Priority source 1
(8100)
Released / not
released
Priority source 2
(8101)
Released / not
released
...............................
For a request via 0...10V input
•
Inputs/outputs test
menu
Voltage in H1
Voltage signal H1
(7840)
To be validated with
the voltage sent by
the boiler room's
PLC
For a request via LPB
Содержание EVO S 50
Страница 2: ......
Страница 106: ...106 136 00RNO0333 B U0625869 EVO S Installation and Servicing...
Страница 135: ...27 08 2018 135 136 EVO S Installation and Servicing...