72 / 136
00RNO0333-B (U0625869)
EVO S -
Installation and Servicing
Diagrams: VF20, VF21, VF21bis
page 4 / 5
E. SPECIFIC START-UP PROCEDURE
"
"
Make the accessories' electrical connections.
"
"
Start up the boiler only.
"
"
Make the following settings:
Line No. Value
• Configuration
menu
Save the sensors
Save sensors
(6200)
Yes (switches back
to no automatically)
•
Time and date
menu
Set the time
Hours / minutes
(1) HH.MM
Set the date
Day / month
(2) DD.MM
Set the year
Year
(3) YYYY
• Configuration
menu
Start up heating circuit 1
Heating circuit 1
(5710)
On
Configure the alarm output
Relay output QX1
(5890)
Alarm output K10
Configure the direct circuit pump Q2
Relay output QX2
(5891)
Heat circuit pump
HC1 Q2
•
Heating circuit 1
menu
For each circuit:
Adjust the comfort setting
Comfort setpoint
(710)
- - -
Adjust the curve slope
Heating curve slope
(720)
- - -
Adjust the min. flow temperature for
heating circuit 1, if necessary
Flow temp setpoint min
(740)
in °C
Removal of the over-value
Mixing valve boost
(830)
0 °C
•
Switch the heating regime to permanent comfort
F. ELECTRICAL AND HYDRAULIC VALIDATION
• Inputs/outputs test
menu
Check the outputs
Alarm relay
Relay test
(7700)
Relay output QX1
Direct circuit pump Q2
Relay test
(7700)
Relay output QX3
Reset the outputs
Relay test
(7700)
No test
Содержание EVO S 50
Страница 2: ......
Страница 106: ...106 136 00RNO0333 B U0625869 EVO S Installation and Servicing...
Страница 135: ...27 08 2018 135 136 EVO S Installation and Servicing...