SAN32M1 Fabric Switch Installation and Service Manual
300
Figure 167
Shut down windows dialog box
b. Select the Shut Down option from the list box and click OK. The
EFC Server powers down.
c. Wait approximately 30 seconds and press the power button on
the LCD panel to power on the server and perform POSTs.
During POSTs:
1. The green LCD panel illuminates.
2. The green HDD LED blinks momentarily, and processor
speed and random-access memory information display
momentarily at the LCD panel.
3. After a few seconds, the LCD panel displays the following
message pertaining to boot sequence selection (
Figure 168
):
Figure 168
LCD panel during boot sequence
4. Ignore the message. After ten seconds, the server performs
the boot sequence from BIOS. During the boot sequence, the
server performs additional POSTs and displays the following
operational information at the LCD panel:
•
Host name.
•
System date and time.
•
LAN 1 and LAN 2 IP addresses.
i24M1061
Boot from LAN?
Press <Enter>
Содержание SAN32M1
Страница 1: ...IBM TotalStorage SAN32M1 Switch Installation and Service Manual GC26 7665 01...
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN32M1 Switch Installation and Service Manual GC26 7665 01...
Страница 12: ...SAN32M1 Fabric Switch Installation and Service Manual x...
Страница 18: ...SAN32M1 Fabric Switch Installation and Service Manual xvi...
Страница 20: ...SAN32M1 Fabric Switch Installation and Service Manual xviii...
Страница 82: ...SAN32M1 Fabric Switch Installation and Service Manual 50...
Страница 222: ...SAN32M1 Fabric Switch Installation and Service Manual 190...
Страница 418: ...SAN32M1 Fabric Switch Installation and Service Manual 386...
Страница 454: ...SAN32M1 Fabric Switch Installation and Service Manual 422...
Страница 532: ...SAN32M1 Fabric Switch Installation and Service Manual 500...
Страница 536: ...SAN32M1 Fabric Switch Installation and Service Manual 504...
Страница 625: ......
Страница 626: ...Printed in USA GC26 7665 01...