
C2003300
Explanation:
Start SoftPOR of a failed ISL slot
Response:
1.
Go to Recovering the system firmware.
2.
Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2003350
Explanation:
Waiting for SoftPOR of a failed ISL slot
Response:
1.
Go to Recovering the system firmware.
2.
Replace the system-board, as described in Replacing the system-board and chassis assembly.
C20033FF
Explanation:
Finish SoftPOR of a failed ISL slot
Response:
1.
Go to Recovering the system firmware.
2.
Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2004100
Explanation:
Waiting for load source device to enlist
Response:
1.
Go to Recovering the system firmware.
2.
Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2004200
Explanation:
Load source device has enlisted
Response:
1.
Go to Recovering the system firmware.
2.
Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2004300
Explanation:
Preparing connection to load source device
Response:
1.
Go to Recovering the system firmware.
2.
Replace the system-board, as described in Replacing the system-board and chassis assembly.
C2003300 • C2004300
Chapter 8. Troubleshooting
247
Содержание Flex System p270 Compute Node
Страница 1: ...Power Systems IBM Flex System p270 Compute Node Installation and Service Guide IBM ...
Страница 2: ......
Страница 3: ...Power Systems IBM Flex System p270 Compute Node Installation and Service Guide IBM ...
Страница 38: ...26 Power Systems IBM Flex System p270 Compute Node Installation and Service Guide ...
Страница 40: ...28 Power Systems IBM Flex System p270 Compute Node Installation and Service Guide ...
Страница 110: ...98 Power Systems IBM Flex System p270 Compute Node Installation and Service Guide ...
Страница 498: ...486 Power Systems IBM Flex System p270 Compute Node Installation and Service Guide ...
Страница 509: ...Appendix Notices 497 ...
Страница 510: ...IBM Printed in USA ...