4-8
Service Guide
3. If the battery backup unit is installed, set the Master CB2 circuit breaker to On.
4. Set the Master CB1 circuit breaker to On.
Battery
Backup
Unit
Power
Distribution
Unit
Master
CB2
Master
CB1
Power
Distribution
Unit
Rear View of Rack
5. Close the back door of the system unit.
6. Plug all external device power cords into the electrical outlets.
7. Switch on power to all external devices attached to the system unit.
Note: Before setting the Power button to on, wait for the operator panel display to display
the word “Stand-By.”
8. Set the Power button to on (button pushed in).
Key Mode Switch
Normal
Secure
Service
Operator Panel
Power Button
Operator Panel Display
Содержание 7015-R30
Страница 1: ...7015 Models R30 R40 and R50 CPU Enclosure Installation and Service Guide...
Страница 10: ...x Service Guide...
Страница 14: ...xiv Service Guide...
Страница 34: ...1 20 Service Guide...
Страница 206: ...6 2 Service Guide Detail 1 Front Bezel Front Access Plate and CPU Enclosure 1 2 3 4 5 10 11 12 6 10 11 12 9 7 8...
Страница 210: ...6 6 Service Guide Detail 3 Media Module 1 21 22 2 3 7 6 5 4 13 9 8 20 16 14 10 15 17 11 18 23 24 19 12...
Страница 212: ...6 8 Service Guide Detail 4 CPU Module 1 of 3 17 18 19 3 12 1 2 5 6 4 7 20 21 22 14 8 9 10 16 15 24 25 11 13 23...
Страница 214: ...6 10 Service Guide Detail 5 CPU Module 2 of 3 26 27 29 30 31 32 33 34 28 35...
Страница 216: ...6 12 Service Guide Detail 6 CPU Module 3 of 3 36 37...
Страница 252: ...B 8 Installation and Service Guide...
Страница 288: ...Service Guide D 30...
Страница 299: ......
Страница 300: ...Printed in the U S A SA23 2743 02 40H7126...