
3.10 Installing a condensate neutralizer
3.11 Water piping (space heating)
3.11.1 General piping best practices
3.12 Water piping (domestic hot water)
3.12.1 Domestic hot water system
3.12.2 Domestic hot water piping
3.14.1 Power management, quality and electrical protection
3.14.2 120VAC line-voltage hook-up
3.14.4 Thermostat / sensor wiring
3.14.5 Wiring zone valves in place of pumps
3.14.6 Thermostat heat anticipator
4.0 About the boiler controller
5.0 Before operating the boiler
Checklist for electrical conditions, ducting and water connections
6.1 Lighting and shutting down the boiler
6.2 Testing the ignition safety shutoff
6.3.1 Checking a boiler's fuel source
6.3.2 Performing a fuel conversion
6.3.4 Testing the LWCO function
6.3.5 Testing the Hi-Limit cutoff temperature function
7.1 Maintenance checklist for homeowner
4
Section: Contents
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...