
Isolation valve between boiler and relief valve not permitted
Microbubble air eliminators are best installed where the fluid is at the highest
temperature and lowest pressure
Expansion tank connection (point of no pressure change) should be on the suction
side of the circulator, with minimal pressure drop between.
Fill station with isolation valve closed, or fill tank.
Dirt separator recommended
Thermostatic tempering valve (if required by local code)
Domestic water
DHW relief valve
Primary loop circulator built into return side of boiler
Figure 30
Boiler trim options - single boiler
Fluid fill is most often accomplished by using a boiler regulator and fill valve set at 12 psig or
more, with the appropriate backflow prevention device as required by local code. This is
acceptable in areas where municipal water or well water has been treated and filtered to
remove excessive minerals and sediment, and water chemistry is known to be suitable for
52
Section: Installation
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...