
5.
Ensure that the trap upper union nut is
secured by the outlet clip.
6.
Check that all trap fittings have been
hand-tightened to prevent leakage of
flue gases. Do not use tools and over-
torque. Check for leaks.
3.10 Installing a condensate neutralizer
If discharging condensate into building drain piping materials that are subject to corrosion, use a
neutralization package.
Caution
After installing a condensate neutralization package, the pH of the condensate discharge
must be measured on a regular schedule to ensure the neutralizing agent is active and
effective.
Danger
The water in the condensate neutralizer can cause severe burns to the skin. Wear
protective gloves and eye wear when servicing the condensate neutralizer.
45
3.10 Installing a condensate neutralizer
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...