75
6.0 Boiler operation
Before operating the appliance, there are some important pre-igntion checks that need to be
performed. For more information, see
Before operating the boiler on page 73
. To understand the
boiler start-up process, see
Sequence of Operation on page 116
. If the sight glass viewport clouds up
at start-up, see
Cleaning the sight glass on page 98
.
6.1 Lighting and shutting down the boiler
Start-up Checklist
Check
Followed lighting and shutting down procedure.
□
Tested the ignition safety shutoff function (see
Testing the ignition safety shutoff on page
).
□
Checked the appliance's fuel source, and if necessary,
using
the appropriate P-kit.
□
Performed gas pressure test by
measuring the inlet gas pressure
□
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...