
3.6 Installation clearances
Warning
Exposed water piping and associated components (relief valves, circulators, etc.,
should not be in contact with combustible materials. Check local codes for required
clearances and / or provide adequate insulation.
CX 150, CX 199
Surface
Minimum distance from
combustible surfaces
Recommended clearance for
installation and service
Front
2"
24"
Rear flue connection
0"
0"
Left side
0"
4" (allow access to water
connections)
Right side
1"
4" (allow access to water
connections)
Top
2"
6"
(for vent connections)
Bottom
0" (clearance for pipes)
12" (for condensate trap and
piping)
Table 3
Clearance distances for boiler mounting sites
A minimum distance below the boiler of 12" is required to provide clearance for the supplied
condensation trap assembly. More clearance will typically be required to accommodate
associated water and gas piping.
3.7 Exhaust venting and air intake
Warning
Venting, condensate drainage, and combustion air systems for all IBC boilers must be
installed in compliance with all applicable codes and with instructions provided in the
respective installation manuals.
Inspect finished vent and air piping thoroughly to ensure all are airtight, and comply
with the instructions provided as well as with the requirements of applicable codes.
Failure to comply will result in severe personal injury or death.
These approved “Category IV” vented appliances offer flexible installations via direct vent (sealed
combustion) or indoor combustion air.
24
Section: Installation
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...