
Warning
Important!:
Maintain at least the minimum separation of exhaust vent termination
from boiler intake air as illustrated in
,
,
and
. Failure to do so can result in a dangerous situation where exhaust gasses are re-
ingested with combustion air. Damage to the boiler can result from a failure to
maintain these separations. Third party vent termination kits and concentric wall
penetration kits that do not maintain these minimum separations must
not
be used.
Improper installation will void the warranty. Do not use proprietary InnoFlue or
PolyPro PP terminals without specific approval from IBC.
Figure 12
Vent termination clearance--horizontal
perforations
Figure 13
Vent termination clearances--
horizontal perforations, side view
36
Section: Installation
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...