
The controller provides overall management of the boiler operations including:
Power-up, self-diagnostics, easy Load parameter adjustments
Burner operation, safety management systems, call-for-heat
management and load priority
Real time boiler data
Temperature and throttle operation
Maintenance of operational and error service logs
2-way communication between other IBC boilers and controls
Internet connection and communication
Operational and historical data may be accessed from the
Status
menu >
Load Status
>
Load Profiles
and
Load Statistics
screens. Also in the
Status
menu, you can view error logs, including records of all errors since
original power-up complete with the date and time of the error.
4.2 Control interface
The control interface is provided through a color touchscreen display. The touchscreen responds
to a light finger touch on the screen. You can also use a stylus, pencil, or similar device to operate
the touch controls. Do not use a sharp or metallic object such as a screw driver to operate the
control as it could damage the touchscreen.
Prior to any interaction with the touchscreen, the display shows the Home screen details of the
current boiler status. If the controller has been left on the Home screen long enough (user
adjustable, 10 minutes by default) the display dims to save power.
The control automatically returns to the home screen if left unattended. The screens will step back
one screen at a time in 10-minute increments if the touchscreen has not been touched. The pop-
up windows will also step back automatically in 2-minute intervals.
The boiler status bar indicates if the boiler is in a normal, warning or alarm state. When no warning
or alarm state is present, the bar will be green and the time will be displayed inside the green area.
The bar can also be yellow or red corresponding a warning or alarm state. Text inside the bar will
indicate the specific warning or alarm present. If more than one alarm is present the text display
will slowly change, rotating though the alarms that are present.
72
Section: About the boiler controller
Содержание CX Series
Страница 6: ...Boiler part diagrams CX 150 CX 199 118 Installation Commissioning Report 122 6 Section Contents...
Страница 10: ...Intentionally left empty...
Страница 13: ...Figure 2 Top and bottom view CX 150 CX 199 dimensions Figure 3 Front and side view CX 199 13 CX 199 dimensions...
Страница 70: ...Intentionally left empty...
Страница 84: ...Intentionally left empty...
Страница 102: ...Intentionally left empty...
Страница 114: ...Appendices Wiring diagrams Figure 48 Controller electrical diagram 114 Section Troubleshooting...
Страница 115: ...Figure 49 Internal wiring diagram 115 Wiring diagrams...
Страница 116: ...Figure 50 Sequence of Operation 116 Section Troubleshooting...
Страница 117: ...8 4 Exploded views of the CX 150 CX 199 appliance 117 8 4 Exploded views of the CX 150 CX 199 appliance...
Страница 119: ...119 Boiler part diagrams CX 150 CX 199...