![HygroMatik WL-ROL 160-1200 Series Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/hygromatik/wl-rol-160-1200-series/wl-rol-160-1200-series_manual_2192888004.webp)
Page 4
8.1 Flushing of the membrane(s) ............................................................................................ 28
8.2 Adjustment of the permeate quality ................................................................................... 29
8.2.1 Increase of the working pressure before the membranes .............................................. 30
8.3 Continuation of initial start-up after successful adjustment of the recovery rate ............... 31
8.4 Filling the antiscalant tank ................................................................................................. 31
8.5 Adjusting the metering pump ............................................................................................. 31
8.6 Complete the initial start-up ............................................................................................... 32
8.7 Break of use ...................................................................................................................... 32
9.1 General .............................................................................................................................. 33
9.2 Safety instruction for maintenance .................................................................................... 33
9.3 Routine maintenance ........................................................................................................ 34
9.3.1 Change prefilter .............................................................................................................. 34
9.3.2 Filling of the antiscalant canister .................................................................................... 34
9.3.3 Replacing the UV lamp ................................................................................................... 34
9.3.4 Reset maintenance counter ........................................................................................... 34
9.4 Special maintenance and repairs ...................................................................................... 35
9.4.1 Membrane exchange ...................................................................................................... 35
9.4.2 Replacing the metering pump fuse ................................................................................. 35
9.5 Maintenance scheme ........................................................................................................ 36
9.5.1 Daily maintenance .......................................................................................................... 36
9.5.2 Weekly maintenance ...................................................................................................... 36
9.5.3 Maintenance every two months ...................................................................................... 36
9.5.4 Maintenance by qualified personnel ............................................................................... 36
11.1 The control panel ............................................................................................................. 38
11.2 Operating states .............................................................................................................. 40
11.2.1 Alarm messages ........................................................................................................... 41
11.3 Menu navigation .............................................................................................................. 42
11.4 Setting options at operator level ...................................................................................... 43
11.5 Menu Structure ................................................................................................................ 44
11.6 Setting options at service level ........................................................................................ 46
11.6.1 Conductivity sensors ................................................................................................... 46
11.6.2 Calibration of the probe zero point ............................................................................... 47
11.6.3 Calibration of the probe slope ...................................................................................... 48
11.6.4 Permeate set point calibration ...................................................................................... 48
11.6.5 RAW/MIX set point calibration ...................................................................................... 49
Содержание WL-ROL 160-1200 Series
Страница 1: ...FlexLine Reverse osmosis plants MANUAL WLROL EN E 8881184 WLROL ENj WL ROL 160 1200...
Страница 62: ...Page 62...
Страница 65: ...Page 65 13 Declaration of Conformity...
Страница 66: ...Page 66...
Страница 72: ...Page 72 This page intentionally left blank...
Страница 73: ...SPA Page 73 This page intentionally left blank...