![HygroMatik WL-ROL 160-1200 Series Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/hygromatik/wl-rol-160-1200-series/wl-rol-160-1200-series_manual_2192888028.webp)
Page 28
8.1 Flushing of the membrane(s)
When the system is started for the first time
and each time it is put into operation after a
period of non-use, you must remove the
chemical maintenance solutions and/or
standing water. If the system is not used for a
longer period of time, the membrane(s) must
be replaced!
Ensure no water pressure is applied!
In addition, the membranes must be gradu-
ally moistened without being submitted to the
working pressure (5-6 bar). The water must
flow through the filters and membranes at
line pressure for several minutes before the
pump can be activated.
Do not use the water produced during this
phase.
»
Lead the hose for the concentrate
and the permeate into the drain.
Note hygiene guidelines (see chap-
ter water connection).
»
Make sure that the water supply is
interrupted.
»
Don‘t connect the permeate pipe to
the consumer!
»
Connect the unit to the power supply
and switch the red main switch in
the switch box to "ON".
Unit switches off after the self-test with error
message "MIN PRESSURE".
»
Press "
ENTER
" for two seconds, the
display shows: "PASSWORD 0000".
»
Enter service password
»
Confirm with "Enter"
»
Select menu item 14 (system test)
»
Press
(Open the water inlet valve SV01*)
»
Press
(Open the flush valve SV02*)
»
Open the feed water supply
»
Vent the filter containers via the screw
in the upper part of the blue filter con-
tainers.
»
Open the hand control valve BV04*
(flushing) completely
»
Let the system flush for 10 minutes
»
Regulate the pressure at the control
valve BV04* to 1 bar, read on the
pressure gauge immediatetely
downstream of the pump (PI02*).
»
Let the system flush for 10 minutes
»
Press
(switch on the pump)
»
Adjust the pressure at flush valve
BV04 to 2 -2.5 bar, read on the pres-
sure gauge immediately dowstream
of the pump (PI02*)
»
Let the system run for 5 minutes
»
Press
(close the flush valve SV02)
The permeate produced in this phase has not
yet reached its final quality. However, a part
of it can be used to thin the antiscalant in the
canister.
»
Let the unit run for 10 minutes in this
mode and continue with the adjust-
ment of the recovery rate.
»
Press
(switch off the pump)
»
Press
(close the water inlet valve SV01)
»
Press
2x "ESC"
(leaving the service
level).
The system starts the permeate production.
* see figure on the next page
Содержание WL-ROL 160-1200 Series
Страница 1: ...FlexLine Reverse osmosis plants MANUAL WLROL EN E 8881184 WLROL ENj WL ROL 160 1200...
Страница 62: ...Page 62...
Страница 65: ...Page 65 13 Declaration of Conformity...
Страница 66: ...Page 66...
Страница 72: ...Page 72 This page intentionally left blank...
Страница 73: ...SPA Page 73 This page intentionally left blank...