71/98
Last change 10/2018 E-P | Subject to technical modifications
4. Brine tank overflows
No. Inspection
Result
Action
1.
Is the power supply as far as the
control system ensured without
interruption?
Power supply is
guaranteed
Proceed with 2
Power supply is
interrupted
Provide power supply
and initiate regeneration
2.
Check whether or not the control
valve is ready for operation
Operational readiness
correct
Proceed with 3
Operational readiness
incorrect
Possibly technical fault;
Call service!
3.
Calculate filling time of brine tank
and compare with technical
parameters
Filling time correct
Proceed with 4
Filling time too long
Correct filling time
4.
Is the brine being drawn
correctly? (The brine from the
tank must initially be drawn to
resin vessel and sufficient water
for one regeneration be filled back
to the salt tank). Initiate
regeneration
Sufficient brine quantity
drawn
Call service!
Brine not sufficiently
drawn
Check injector
5.
Dismantle injector and check for
contamination and damage
Contaminated or faulty
injector
Clean / replace injector
and active regeneration
after brine formation
Injector clean
Probably faulty brine
valve
Call service!
Содержание HYDROION VAD 125-CS 1
Страница 18: ...18 98 Last change 10 2018 E P Subject to technical modifications 2 4 Pressure loss curve...
Страница 80: ...80 98 Last change 10 2018 E P Subject to technical modifications Appendices 1 Installation schematic softener...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......