28/98
Last change 10/2018 E-P | Subject to technical modifications
Furthermore DIN 19636 (section: “protection against bacterial contamination”) must be observed:
“As water softening systems, especially at discontinuous operation, are vulnerable to bacterial
contamination, this must be prevented by means of suitable constructive or chemical-physical
measures.”
In order to keep that DIN 19636, a forced regeneration after 4 days (96 hours) has to be
programmed in the controller of the HYDRO
ION
®
VAS
– CS softener system.
Installation of a chlorine producer into the brine hose is provided ex works for the system designs
VAS CS
– A (systems with full salting) and B (systems with economic salting).
The chlorinator is actuated via the micro processor control unit.
The installation of the system must be carried out by trained and qualified personnel.
DIN 1988, DIN EN 12506 and DIN EN 806 are to be observed during installation.
2. Installation location
The below has to be guaranteed in respect of the installation and operation of a softener:
The HYDRO
ION
®
VAS - CS softener is to be installed in a frost-protected area.
The ambient temperature must not drop below 5°C and not exceed 40°C.
A free discharge to the drainage system as per EN 1717 (DIN 1988) for waste water and
overflow of brine tank in accordance with the discharge volume is to be provided locally.
Installation should be located on even floor with level tolerances as per DIN 18202.
The minimum installation dimensions are shown in the dimensional drawings and table (see
chapter
III
).
An electrical connection of 230 V, 50 Hz, 3 A fused spur is to be provided locally for the
operation of the micro processor control.
In order to avoid flooding by leakage, the installation location must be provided with ground
drainage discharge or leakage monitor with corresponding alarm.
3. Work prior to assembly
Delivery check
Prior to starting assembly, the equipment must be
checked for completeness and possible transport
damage.
Any deviation must be notified immediately.
Waste water connection
The local waste water connection must be provided as
free discharge as per EN1717 (DIN 1988).
The cross section of the drain must be sufficiently
dimensioned (DN 50 at least).
Mains / incoming and soft
water pipes
The mains water and soft water pipes must be designed
locally in the required cross section and in the necessary
position in relation to the system.
Materials for soft water pipes should be plastic or
stainless steel.
Содержание HYDROION VAD 125-CS 1
Страница 18: ...18 98 Last change 10 2018 E P Subject to technical modifications 2 4 Pressure loss curve...
Страница 80: ...80 98 Last change 10 2018 E P Subject to technical modifications Appendices 1 Installation schematic softener...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......