26/98
Last change 10/2018 E-P | Subject to technical modifications
Index chapter
IV
– Installation and assembly
Page
1.
General information
27
2.
Installation location
28
3.
Work prior to assembly
28
Control of shipment
28
Drain connection
28
Incoming and soft water pipe
28
3.1
Filling of filter vessel with quartz gravel and exchange resin
29
4.
Hydraulic connections at control valve
31
Control valve 1“
HYDRO
ION
®
VAS
– CS 1
31
Control valve 1 1/2“ HYDRO
ION
®
VAS
– CS 1.5
31
Control valve 2“
HYDRO
ION
®
VAS
– CS 2
31
Brine line
32
Brine lack sensor
32
Chlorinator
32
Wash water connection (drain)
32
5.
Electric connections
33
Mains connection
33
Connection pcb control valve
33
Connection water volume meter
34
Содержание HYDROION VAD 125-CS 1
Страница 18: ...18 98 Last change 10 2018 E P Subject to technical modifications 2 4 Pressure loss curve...
Страница 80: ...80 98 Last change 10 2018 E P Subject to technical modifications Appendices 1 Installation schematic softener...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......