Inspection- and maintenance interval
The below components in the mains water pipe shall be checked and maintained in the shown
intervals:
3.1 Cleaning
Important!
Please bear in mind that the cleaning should either be carried out by Hydrotec (UK) Ltd
or by
an authorized specialist company.
Injector and injector sieve must be dismounted and cleaned in regular intervals dependent on purity
of mains water (during plant maintenance at the latest).
Control valve
HYDRO
ION
®
– CS 1
Components (mains water)
Inspection work
Maintenance
System separator
6 months
12 months
Pressure regulator
12 month
Filter, backwash (80
– 150 µm)
6 months
Filter, non backwash (80
– 150 µm)
2 months
6 months
Filter (< 80 µm)
6 months
Water flow meter (cold)
12 months
6 years
Dosing system
2 months
6 months
Brine draw in
Flow direction
Flow control
(BLFC)
Injector filter
Injector
fig.24
Содержание HYDROION VAD 125-CS 1
Страница 18: ...18 98 Last change 10 2018 E P Subject to technical modifications 2 4 Pressure loss curve...
Страница 80: ...80 98 Last change 10 2018 E P Subject to technical modifications Appendices 1 Installation schematic softener...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......