33/98
Last change 10/2018 E-P | Subject to technical modifications
Important!
All pipe connections must be done without any tension applied on. If necessary, the
subsequent pipes must be provided with corresponding mounts or supports.
Hoses must not be bent and hose connections must be screwed tight.
Waste water, overflow and discharge lines must be provided from the connections at the
control valve until waste water drain with an appropriate inclination.
The waste water must be allowed to drain without backflow.
Backflow is not allowed for hygienic reasons!
5. Electrical connections
Mains connection
The control in wall mount casing must
be installed at eye level and easily
accessible!
A safety socket must be provided locally next to
the mains cable of the micro processor control.
Permanent voltage must be provided
(230 V / 50 Hz).
Do not use the lighting circuit!
Figure 23 shows all electrical supplies and
control lines to the micro processor control unit.
1 = Power supply
2 = Connection cable chlorinator
3 = Connection cable brine level sensor
4 = Connection cable control valve 1 (A)
5 = Connection cable control valve 2 (B)
Connection pcb control valve
Connections to terminal of pcb of control valve
(from top to below)
Terminal
Magenta
29 / 38
Grey
28 / 37
Black
27 / 36
Red
26 / 35
Blue
25 / 34
Brown
24 / 33
White
23 / 32
Yellow
22 / 31
Green
21 / 30
1 = Connection motor control valve
2 = Connection water flow meter
1
1
2
fig.23
3
2
4
5
fig.22
Содержание HYDROION VAD 125-CS 1
Страница 18: ...18 98 Last change 10 2018 E P Subject to technical modifications 2 4 Pressure loss curve...
Страница 80: ...80 98 Last change 10 2018 E P Subject to technical modifications Appendices 1 Installation schematic softener...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......