63/98
Last change 10/2018 E-P | Subject to technical modifications
1. Check prior to commissioning
Filling of quartz gravel / resin
Have the resin vessels (pressure vessel) been filled as
described in chapter
IV
?
Quantity see table chapter
III
/ point 2
Hydraulic connections
Is the below pipeline connected and tight?
- mains water pipe
- soft water pipe
- wash water pipe (waste water)
- brine line
- overflow brine tank
Are the connecting pipes connected properly and tight?
Electrical connection
Is a safety socket installed next to the mains cable and is
permanent voltage available?
Is the water meter connected to the plug connections of
the central control valve?
Is the below equipment connected to the micro processor
control unit?
- control valve
- brine level sensor
- chlorinator
Is the micro processor control unit connected to mains?
Mains water pressure
The mains water pressure may not drop below or
exceeding the following parameters:
Min. pressure:
2.0 bar (flow pressure)
Max. pressure:
8.0 bar (static pressure)
Regenerant
Is sufficient regenerant available for the first and initial
brine tank filling at least?
Salt quantity see tables in chapter III / point 2
Important!
Do not fill in the salt yet!
Brine valve
The float is adjusted ex works to the necessary brine
volume.
Содержание HYDROION VAD 125-CS 1
Страница 18: ...18 98 Last change 10 2018 E P Subject to technical modifications 2 4 Pressure loss curve...
Страница 80: ...80 98 Last change 10 2018 E P Subject to technical modifications Appendices 1 Installation schematic softener...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ......
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......