Installing Hardware
CAUTION
When you install the support rails on the FC switch, ensure that the left and right support rails
are properly installed in correct positions. If the brackets are not flush with the bottom of the FC
switch, check whether the support rails are installed on wrong sides. Reinstall the support rails
if they are not correctly installed.
For details on how to install the S5600 controller subrack, see the
OceanStor S5600 Controller
Subrack User Guide
.
For details on how to install a D200 disk subrack, see the
OceanStor D200 Disk Subrack User
Guide
.
For details on how to install a switch, see the related product documents.
For details on how to install an AS, see the related product documents.
NOTE
For details on how to install cluster software, see the related product documents.
For details on how to install the maintenance terminal, see the related product documents.
Checking Hardware
CAUTION
Before checking equipment installation and cable connection, ensure that the power supply is
cut off to avoid physical injury or equipment damage due to improper installation or connection.
Check the equipment installation as instructed in the tables below.
Table 1-1
describes the
equipment installation checklist.
Table 1-1
Equipment installation checklist
Item
Normal
Abnormal
S5600 controller
subrack
The device is placed stably
without displacement.
The device is slanted and loosened.
D200 disk subrack
The device is placed stably
without displacement.
NOTE
Ensure that the setting rate of the
DIP switch on the D200 disk
subrack is the same as that of the
DIP switch on the S5600 controller
subrack.
The device is slanted and loosened.
1 Process of the Initial Configuration
OceanStor S5600 Storage System
Initial Configuration Guide
1-6
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2009-09-30)