6.9 Installing Adjustable Guide Rails for a Fibre Channel Switch
6.10 Installing a Fibre Channel Switch
6.11 Installing Adjustable Guide Rails for an Ethernet Switch
6.12 Installing an Ethernet Switch
6.13 Installing a Filler Panel
This section explains how to attach a label for a signal cable and for a power cable.
6.15 Setting Up a Heartbeat Network for CNENs
6.16 Connecting CNENs to the Service Network
This section explains how to connect CNENs to the NAS service network.
This section explains how to connect SUCs to CNENs through optical fibers.
6.18 Connecting Multiple SUDs to One SUC
This section explains how to connect multiple SUDs to one SUC through mini SAS cables.
6.19 Connecting the CNEN to the Maintenance Terminal
6.20 Connecting SUCs to the Maintenance Terminal (PC)
OceanStor N8500 Clustered NAS Storage System
Installation Guide (for T Series V100R005)
6 N8500 Installation (with S5500T Storage System as the
Storage Unit)
Issue 02 (2015-09-22)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
96