Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
List of Figures
Huawei Technologies Proprietary
viii
Figure 5-37
Installing GPS lightning arrester (2) ................................................................. 5-35
Figure 5-38
Wrong and correct operations .......................................................................... 5-37
Figure 5-39
Making lugs ...................................................................................................... 5-38
Figure 5-40
Removing the cover of the power lightning protection filter ............................. 5-39
Figure 5-41
Installing the L1, L2, L3, and N lines ................................................................ 5-40
Figure 5-42
Installing short-circuit sheets (1)....................................................................... 5-41
Figure 5-43
Installing short-circuit sheets (2)....................................................................... 5-42
Figure 5-44
AC power lightning arrester used in the case of two-phase power supply ...... 5-43
Figure 5-45
Connecting the 110 V power cables ................................................................. 5-43
Figure 5-46
PGND cable of the cabinet ............................................................................... 5-44
Figure 5-47
Removing the cover the battery cabin.............................................................. 5-47
Figure 5-48
Pulling out the sliding plate............................................................................... 5-47
Figure 5-49
Placing and connecting two batteries............................................................... 5-48
Figure 5-50
Pushing the batteries inside the cabin.............................................................. 5-48
Figure 5-51
Placing another two batteries ........................................................................... 5-49
Figure 5-52
Connecting the rest cables ............................................................................... 5-50
Figure 5-53
Access control and temperature sensor cable ................................................. 5-51
Figure 5-54
Connecting cables in the extended battery cabinet ......................................... 5-52
Figure 5-55
Connecting external cables of the battery cabinet ........................................... 5-53
Figure 5-56
Connecting PGND cables of the battery cabinet.............................................. 5-53
Figure 5-57
Outlets of the battery cabinet............................................................................ 5-54
Figure 5-58
Connecting cables of battery cabinet to DC lightning arrester ......................... 5-55
Figure 6-1
Front panel of the AC power distribution box ....................................................... 6-4