Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 3 Installing Cabinet and Cabinet Equipment
Huawei Technologies Proprietary
3-1
Chapter 3 Installing Cabinet and Cabinet
Equipment
This chapter introduces how to install the BTS3606A cabinet, the battery cabinet, and
the equipment inside these cabinets.
3.1 Installation of Cabinet
During the installation of combined cabinets, the extension cabinet is installed in the
same way as the basic cabinet.
To install the basic cabinet, proceed as follows:
1) Position
the
cabinet.
2)
Level the cabinet.
3)
Fasten the cabinet.
4) Install
accessories.
3.1.1 Positioning Cabinet
Lift and place slowly the cabinet over the base and align the installation holes on the
bottom of the cabinet with those on the base.
Caution:
z
An empty cabinet weighs 450 kg (992 lb.). Confirm the lifting capability of the lifting
equipment beforehand.
z
When lifting the cabinet, make sure that all the four lugs are reliably hooked, the
angle between the lifting rope and the top of the cabinet is at least 60
o
, and the
cabinet is level. Installers must stay away from the cabinet when lifting it and make
sure that the front and rear doors are closed.
z
When installing the cabinet in bad conditions (for example, when there is strong
wind), pay extra attention to the gravity center of the cabinet to prevent the cabinet
from slanting.
If the cabinet cannot be lifted on site, position the cabinet according to the bearing
points shown in Figure 3-1 and site characteristics.